Type:Drying Oven | Condition:New |
Warranty:1 Year | After-sales Service Provided:Online support, Video technical support, Free Spare Parts, Field installation, commissioning and training, Field maintenance and repair service |
Place of Origin:Shandong, China | Voltage:380V |
Certification:CE | Dimension(L*W*H):Depends on the capacity |
Power(W):30KW | Application:Medicine Processing, Chemicals Processing, Plastics Processing, Food Processing |
Applicable Industries:Manufacturing Plant, Food & Beverage Factory, Farms | Key Selling Points:Long Service Life |
Material:304 Stainless Steel | Name:Microwave oven |
Color:Silver | Function:Baking Food Production |
Feature:Easy Operation | After-sales Service:rovided: Engineers available to service machinery oversea |
Power source:Electric | Control way:PLC |
Conveyor belt:Teflon | Cooling way:Air cooling system |
Weight:2-5tons |
Product Description
All models include high-tech Programmable Logic Controllers. The PLC comes with common hardwood presets ready for use. The PLC automates the drying process by starting the hydraulic pump, HF generator, vacuum pump and cooling system.
The cooling system pulls the moisture into an external water tank which can then be drained. The weighing system calculates change data to show the moisture content in the wood.
Our engineers can provide overseas installation, training and are available to provide after-sell service and maintenance. We suggest proper training for safe and prolonging use of the machine.
Parameters
Model | BP-2*8m | BP-2*9m | BP-2*10m | BP-2*12m |
Layer | 4 layers, 5 layers, 6layers | |||
Material Thickness | 50-200mm | |||
Drying Temperature | 40-120℃ | |||
Drying Time | 0.5-5hours | |||
Moisture Reduce | 75% to 8% (Customized) | |||
Main Machine Motor | 1.5kw | 1.5kw | 2.2kw | 3kw |
Hot Air Draft Fan | 10C-15kw | 10C-18.5kw | 11C-22kw | 12C-30kw |
Discharge Conveyor | 0.12kw (Gear speed regulating motor) | |||
The above parameters are for reference, we can according to customer required provide best solution. |
FAQ
Q1: How long is your delivery time:
A: Generally it is 7-10 days if the goods are in stock. or it is 20-25 days if the goods are not in stock, it is according to quantity.
Q2:Will you supply overseas service?
A: We will dispatch our engineers to your factory for installation and training as soon as the machines arrive in your factory. You need provide visa fee, transportation fees, room, food and subsidy for our engineers.
Q3: How can I know the process of manufacturing after down payment?
A: We will supply you an exact delivery time as soon as we received your deposit. During the manufacturing, we will make reports for you to let you know the process.
Copyright © 2017 - 2024Shandong Binxing Machinery And Equipment Co., Ltd. All Rights Reserved