English
Home >  Industrial Microwave Dryer >  Stainless Steel Industrial Microwave Vacuum Dryer
Stainless Steel Industrial Microwave Vacuum Dryer Stainless Steel Industrial Microwave Vacuum Dryer Stainless Steel Industrial Microwave Vacuum Dryer

Stainless Steel Industrial Microwave Vacuum Dryer

Product Description All models include high-tech Programmable Logic Controllers. The PLC comes with common hardwood presets ready for use. The PLC automates the drying...
  • $25,000.00 - $35,000.00 / Sets | Get Latest Price
  • L/C,D/A
  • Shandong
  • ISO,CE

Product Details

Type:Drying Oven Condition:New
Warranty:1year Place of Origin:Guangdong, China
Voltage:380V/220V Certification:CE/ISO
Dimension(L*W*H):600*900*500mm Power(W):6kw
Product name:Industrial Microwave Dryer Exterial Material:SUS#304 Stanless Steel+Power Coated
Inner Material:SUS 304 Stainless Steel Temperature range:+10℃~200°C, 300°C, 500°C, 700°C
Temperature fluctuation:±3℃ Temperature Uniformity:±0.1℃ AT 200℃;±1.5%AT300℃
Temperature resolution:0.1℃/1℃ Heating up time:500℃/30min
Drying Oven Application:Material,Electronic,Plastic,Food,Chemical,Automobile...ect, Color:Purple and Gray
After-sales Service Provided:Engineers available to service machinery overseas Weight:150kg

Product Description

Product Description
All models include high-tech Programmable Logic Controllers. The PLC comes with common hardwood presets ready for use. The PLC automates the drying process by starting the hydraulic pump, HF generator, vacuum pump and cooling system.
The cooling system pulls the moisture into an external water tank which can then be drained. The weighing system calculates change data to show the moisture content in the wood.

Product Application:
Industrial Microwave Dryer  is suitable for application of microwave in scope of dried fruit, dried fruit meat, candied fruit, etc. microwave makes function on low-temperature dry and sterilization, to extend its preservation.

FAQ
 Q1: How long is your delivery time:
   A: Generally it is 8-10 days if the goods are in stock. or it is 20-25 days if the goods are not in stock, it is according to quantity.
Q2:Will you supply overseas service?
   A: We will dispatch our engineers to your factory for installation and training as soon as the machines arrive in your factory. You need provide visa fee, transportation fees, room, food and subsidy  for our engineers.
Q3: How can I know the process of manufacturing after down payment?
   A: We will supply you an exact delivery time as soon as we received your deposit. During the manufacturing, we will make reports for you to let you know the process.

Related Products

Shandong Binxing Machinery And Equipment Co., Ltd.
Website : www.rolamento.org
Address : Lixia District, Jinan City, Shandong Province

Copyright © 2017 - 2024Shandong Binxing Machinery And Equipment Co., Ltd. All Rights Reserved