Type:Vacuum Drying Equipment | Condition:New |
Warranty:1 Year | After-sales Service Provided:Online support, Field installation, commissioning and training, Field maintenance and repair service |
Place of Origin:Sichuan, China | Voltage:220v/380v |
Certification:ISO SGS | Dimension(L*W*H):2700*300*300mm |
Power(W):20kw | Application:Food Processing |
Applicable Industries:Manufacturing Plant, Food Shop | Key Selling Points:Automatic |
Name:chili dryer | Color:Customized Color |
Usage:Reduce Material's Moisture | Raw material:304 Sainless Steel |
Installation:Engineers Support Installation | Fuel:Electricity Etc |
Advantage:Low Consumption High Efficiency | Function:Food Vegetable Fruit Dehydrator |
Colour:Customer's Riquirement | Package:Wooden Case |
Weight:5000kg |
Parameters
Model | BD-2*8m | BD-2*9m | BD-2*10m | BD-2*12m |
Layer | 4 layers, 5 layers, 6layers | |||
Material Thickness | 50-200mm | |||
Drying Temperature | 40-120℃ | |||
Drying Time | 0.5-5hours | |||
Moisture Reduce | 75% to 8% (Customized) | |||
Main Machine Motor | 1.5kw | 1.5kw | 2.2kw | 3kw |
Hot Air Draft Fan | 10C-15kw | 10C-18.5kw | 11C-22kw | 12C-30kw |
Features
1. Heat efficiency: The entire circulatory system is fully enclosed, to improve the heat efficiency from traditional 3-7% to present 35-45%, highest can reach 50%.
2. Operation: Automatic temperature control system, easy to operate. Trolleys with wheels on the bottom.
3. Heating ways: The heat source can be electricity, steam, gas, coal burning, or dual-use. And please note, usually the machine is equipped with electricity heating way, if choose other heating ways, the machine should work with a furnace or steam boiler.
FAQ
Q1: How long is your delivery time:
A: Generally it is 7-10 days if the goods are in stock. or it is 20-25 days if the goods are not in stock, it is according to quantity.
Q2:Will you supply overseas service?
A: We will dispatch our engineers to your factory for installation and training as soon as the machines arrive in your factory. You need provide visa fee, transportation fees, room, food and subsidy for our engineers.
Q3: How can I know the process of manufacturing after down payment?
A: We will supply you an exact delivery time as soon as we received your deposit. During the manufacturing, we will make reports for you to let you know the process.
Copyright © 2017 - 2024Shandong Binxing Machinery And Equipment Co., Ltd. All Rights Reserved